While preparing for a launch party for "The Incredibles" at their Emeryville offices, Pixar hired Watry Design, Inc. to develop a solution for the additional parking that was needed for the event. Located in an area where parking demand already far exceeds supply, the Watry team had to work within the constraints of Pixar's campus to increase supply by 30%. After studying various options, the winning solution consisted of a combination of valet assisted self-stack parking during peak arrival and valet-assisted parking during peak departure. The process was so effective that Pixar now uses it for all their special events.

Project Details

  • Owner: Pixar. Inc.
  • Project Status: Completed 2005